| Home > Dual Vane Trap Dual Vane TrapThe Dual Vane trap uses strategically placed vertical vanes , placed at varying heights and angles, to guide the |
| 1m Deep Channel | Height | Width | Length |
|---|---|---|---|
| 7m Containment Bay | 1m | 4m | 14m |
| 10m Containment Bay | 1m | 4m | 17m |
| 15m Containment Bay | 1m | 4m | 22m |
| 20m Containment Bay | 2m | 4m | 27m |
Sample Configuration Sizing With Ramp
| 1m Deep Channel | Height | Width | Length |
|---|---|---|---|
| 1.0m Deep Channel | 1m | 4m | 14m |
| 1.5m Deep Channel | 1m | 4m | 17m |
| 2.0m Deep Channel | 1m | 4m | 22m |
| 2.5m Deep Channel | 2m | 4m | 27m |
Note: These figures are indicative only and do not represent the largest or smallest sizes we can treat. If you need an estimate size for your plans please contact us and we will be able to provide this information to you over the phone if you can provide some or all of the Site details.
Lidded
The Dual Vane trap is generally not suited as a lidded solution, however this cannot be ruled out until the sitedetails are known.
Pollutant Storage
The Dual Vane trap is a candidate for either Left or Right handed storage. the Containment Bay size is determined by various factors such as the cleaning frequency, catchment sizr and makeup.
Trap Access
Depending on the site and cleaning requirements the Dual Vane trap can be accessed via a ramp, ladder or internal step irons.
Although Dual Vane traps are normally cast insitu, they can be constructed using a combination of methods whichever suits the site conditions. Standard equipment and modular construction combine to make installation convienient with minimum interruption or alteration to existing conditions. Deep excavation is not a required with the Dual Vane Trap.
Cleaning of the Dual VaneTrap is dependant on the site requirements but any of the following can be used with this design of trap.
Please Note: If a trap is to be cleaned manually, there are minimal Occupation Health and Safety issues even though the caputed pollutants are dry.